Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints

机译:调度规则以最小化并行机器中的总延迟   设置和日历约束的问题

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Quality control lead times are one of most significant causes of loss of timein the pharmaceutical and cosmetics industries. This is partly due to theorganization of laboratories that feature parallel multipurpose machines forchromatographic analyses. The testing process requires long setup times andoperators are needed to launch the process. The various controls arenon-preemptive and are characterized by a release date, a due date andavailable routings. These quality processes lead to significant delays, and wetherefore evaluate the total tardiness criterion. Previous heuristics weredefined for the total tardiness criterion, parallel machines, and setup such asATC (Apparent Tardiness Cost) and ATCS (ATC with setups). We propose new rulesand a simulated annealing procedure in order to minimize total tardiness.
机译:在药品和化妆品行业中,质量控制的交货时间是造成时间浪费的最重要原因之一。这部分是由于实验室的组织,这些实验室具有用于色谱分析的并行多功能机器。测试过程需要很长的设置时间,并且需要操作员来启动该过程。各种控件都是非抢占性的,其特征在于发布日期,到期日期和可用的路由。这些质量过程会导致严重的延误,因此请先评估总迟延标准。之前的试探法是针对总拖延标准,并行机器以及诸如ATC(表观拖延成本)和ATCS(具有设置的ATC)之类的设置而定义的。我们提出了新的规则和模拟退火程序,以最大程度地减少总拖延。