首页> 外文OA文献 >Testing and Implementation Progress on the Advanced Photon Source (APS) Linear Accelerator (Linac) High-Power S-band Switching System
【2h】

Testing and Implementation Progress on the Advanced Photon Source (APS) Linear Accelerator (Linac) High-Power S-band Switching System

机译:高级光子源(aps)的测试和实施进展   线性加速器(Linac)高功率s波段切换系统

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

An S-band linear accelerator is the source of particles and the front end ofthe Advanced Photon Source injector. In addition, it supports a low-energyundulator test line (LEUTL) and drives a free-electron laser (FEL). Awaveguide-switching and distribution system is now under construction. Thesystem configuration was revised to be consistent with the recent change toelectron-only operation. There are now six modulator-klystron subsystems, twoof which are being configured to act as hot spares for two S-band transmitterseach, so that no single failure will prevent injector operation. The twosubsystems are also used to support additional LEUTL capabilities and off-linetesting. Design considerations for the waveguide-switching subsystem, topologyselection, control and protection provisions, high-power test results, andcurrent status are described
机译:S波段线性加速器是粒子的源头,也是高级光子源注射器的前端。此外,它还支持一条低能量波形发生器测试线(LEUTL)并驱动自由电子激光器(FEL)。波导切换和分配系统目前正在建设中。修改了系统配置,使其与最近对纯电子操作的更改保持一致。现在有六个调制器速调管子系统,其中两个被配置为两个S波段发射机的热备用,因此没有任何一个故障会阻止喷油器运行。这两个子系统还用于支持其他LEUTL功能和脱机测试。描述了波导切换子系统的设计注意事项,拓扑选择,控制和保护规定,大功率测试结果以及当前状态

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号