首页> 外文OA文献 >A 3D geological model for B90745 North Trans Pennine Electrification East between Leeds and York
【2h】

A 3D geological model for B90745 North Trans Pennine Electrification East between Leeds and York

机译:利兹和约克之间B90745 North Trans pennine Electrification East的三维地质模型

摘要

This report and accompanying 3D geological model were produced for Tata Steel Projects. The report describes the bedrock and Quaternary geology of the study area, comprising 28 km (17.5 miles) of railway line between Leeds and York. The description and spatial distribution of each geological unit is based on the 3D geological model, which was constructed using 1:10,000 scale digital geological map data and 102 borehole logs from the British Geological Survey’s national archive. All boreholes located within the modelled area were considered in the construction of the geological model, together with key boreholes that fall outside the area of study. The top and base of weathered rock as defined is depicted as layers within the model.
机译:该报告和随附的3D地质模型是为塔塔钢铁项目制作的。该报告描述了研究区域的基岩和第四纪地质,包括利兹和约克之间28公里(17.5英里)的铁路线。每个地质单位的描述和空间分布均基于3D地质模型,该模型是使用1:10,000比例的数字地质地图数据和102个来自英国地质调查局国家档案馆的井眼测井记录构建的。在地质模型的构建过程中,考虑了位于建模区域内的所有钻孔以及落在研究区域之外的关键钻孔。定义的风化岩石的顶部和底部被描述为模型中的图层。

著录项

相似文献

  • 外文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号