Design, transport, construction, and operation of the summer base Kohnen for ice-core drilling in Dronning Maud Land, Antarctica

机译:南极洲Dronning maud Land的夏季基地Kohnen的设计,运输,建设和运营,用于冰芯钻探

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

During the austral summer seasons 1999/2000 and 2000/2001 the summer base "Kohnen" was built as a platform for the EPICA deep ice core drilling in Dronning Maud Land, Antarctica. The design is based on prefabricated container units. The base was erected within two summer seasons. Overland traverses with Pistenbully tractors and cargo sledges moved all needed material and base containers from the German base Neumayer at the Antarctic coast to the base Kohnen 750km inland. All installations were completed at the end of the 2000/2001 season including the drill and science trench with a cased 100-m borehole. Thus everything is prepared to start the deep drilling operation during the 2001/2002 austral summer season.
机译:在1999/2000和2000/2001的南方夏季,在南极Dronning Maud Land的EPICA深冰岩心钻探平台上建立了夏季基地“ Kohnen”。该设计基于预制的集装箱单元。该基地是在两个夏季内竖起的。陆上行驶的是Pistenbully拖拉机和货物滑车,将所有需要的物料和基础集装箱从南极海岸的德国基地Neumayer转移到内陆750公里的Kohnen基地。所有安装都在2000/2001季度末完成,包括带有100 m套管井眼的钻探和科学沟。因此,一切准备就绪,可以在2001/2002夏季南方开始深井钻探作业。