摘要

The study provides longitudinal and cross-sectional analysis of 8 pieces topography data collected from 1980 to 2011 and bed material particle size based on three investigations conducted between 2008 and 2012. The mainstream topography data in December 2007 shows that the head-cutting distance was about 3 kilometers after the dam broke. The topography data since 2008 displays that river the channel is stable as well. The topography data shows that the longitudinal section in the tributary had a head-cutting distance of about 3 kilometers after the dam broke, and the river channel still is showing adjustment behavior. The scour-and-fill analysis result of the mainstream cross-section shows that the transverse adjust changed significantly upstream from the dam location from 2006-2008. The particle size of the bed material has shown a trend from coarsening to fining according to different sampling points. Therefore, the river bed is still adjusting continuously. Finally, this study is based on a debris flow and sediment laden flow numerical model. The simulation result is fit for river-bed changes after dam-break.
机译:该研究基于2008年至2012年之间进行的三项调查,对1980年至2011年收集的8件地形数据以及床层材料粒径进行了纵向和横截面分析。2007年12月的主流地形数据显示,割头距离约为大坝破裂后3公里。自2008年以来的地形数据显示该河道也很稳定。地形数据表明,大坝破裂后,支流的纵断面截断距离约为3公里,河道仍显示出调整行为。主流截面的冲刷和填充分析结果表明,从2006-2008年,大坝上游位置的横向调整发生了显着变化。床料的粒度根据不同的采样点显示出从粗化到澄清的趋势。因此,河床仍在不断调整。最后,该研究基于泥石流和含沙量流数值模型。模拟结果适合于溃坝后河床的变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号