首页> 外文OA文献 >Comparisons of cost and time between precast and cast-in-place with panel formwork systems for constructing load bearing wall townhome : case study The connec 28 Pearmsin and The connect 25 Prachauthit Bangkok
【2h】

Comparisons of cost and time between precast and cast-in-place with panel formwork systems for constructing load bearing wall townhome : case study The connec 28 Pearmsin and The connect 25 Prachauthit Bangkok

机译:使用面板模板系统建造承重墙联排别墅的预制和现浇之间的成本和时间的比较:案例研究连接28 pearmsin和连接25 prachauthit曼谷

著录项

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号