首页> 外文OA文献 >The development of an integrated model for the implementation of a product data management system at Delta Motor Corporation
【2h】

The development of an integrated model for the implementation of a product data management system at Delta Motor Corporation

机译:在Delta motor Corporation开发实施产品数据管理系统的集成模型

摘要

Information technology in mature organisations is viewed as an enabler of teams working together in the product development process. Technology is no longer pursued as an end in itself, but for its contribution to cost control, product quality, and most importantly, time to profit. The focus of this research is the analysis of methodologies used to implement the Teamcenter Engineering Product Data Management (PDM) system at Delta Motor Corporation, which manages all of Delta’s CAD data. The main problem of this research is as follows: How can Delta Motor Corporation successfully implement the “Teamcentre Engineering” Product Data Management System? The main problem will be broken down into three distinct parts, namely the developing of a best practice process, analysing Delta’s implementation and making recommendations for improvement. The literature survey provides the basis for developing a best-practice process, which serves as a benchmark against which to evaluate the methodology used by Delta. Interviews were conducted with selected personnel who were involved in the implementation, and Tesch’s model for content analysis used to analyse the responses. The implementation process of Teamcenter Engineering at Delta was conducted in three phases and only the first was completed at the time of writing this research paper. For this reason, analysis revolves around the first phase of implementation, which was limited to the drawing office, while recommendations are made for the implementation of phase two and three, which roll-out this system to the rest of Delta and it’s supplier base.
机译:成熟的组织中的信息技术被视为团队在产品开发过程中一起工作的推动力。技术本身不再是最终目的,而是因为它对成本控制,产品质量以及最重要的是获利时间的贡献。这项研究的重点是分析用于实现Delta Motor Corporation的Teamcenter工程产品数据管理(PDM)系统的方法,该系统管理Delta的所有CAD数据。这项研究的主要问题如下:Delta Motor Corporation如何成功实施“ Teamcentre Engineering”产品数据管理系统?主要问题将分为三个不同的部分,即制定最佳实践流程,分析达美的实施情况并提出改进建议。文献调查为制定最佳实践流程提供了基础,该流程可作为评估Delta所用方法的基准。与参与实施的部分人员进行了访谈,并使用了Tesch的内容分析模型来分析响应。三角洲Teamcenter Engineering的实施过程分为三个阶段,撰写本文时仅完成了第一阶段。因此,分析主要围绕实施的第一阶段进行,该阶段仅限于图纸办公室,而针对第二和第三阶段的实施则提出了建议,该阶段将这一系统推广到了达美航空的其余部分及其供应商。

著录项

  • 作者

    Stroud Trevor;

  • 作者单位
  • 年度 2003
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号