首页> 外文OA文献 >Observed-score equating as a test assembly problem
【2h】

Observed-score equating as a test assembly problem

机译:观察分数等同于测试装配问题

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A set of linear conditions on item response functions is derived that guarantees identical observed-score distributions on two test forms. The conditions can be added as constraints to a linear programming model for test assembly that assembles a new test form to have an observed-score distribution optimally equated to the distribution on an old form. For a well-designed item pool and items fitting the IRT model, use of the model results into observed-score pre-equating and prevents the necessity ofpost hoc equating by a conventional observed-score equating method. An empirical example illustrates the use of the model for an item pool from the Law School Admission Test.
机译:推导了一组关于项目响应函数的线性条件,以保证在两个测试表单上的观察分数均相同。可以将条件作为约束条件添加到用于测试组装的线性编程模型中,该模型可以组装新的测试表单,使其观察分数分布最佳地等于旧表单上的分布。对于设计良好的项目库和适合IRT模型的项目,使用模型可将结果纳入观察分数预均衡,并避免了使用常规观察分数均衡方法进行事后均等化的必要性。一个经验示例说明了该模型在法学院入学考试中对项目库的使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号