首页> 外文OA文献 >Review of the environmental authorization followed during the construction of Eskom's Kusile and Medupi power stations, South Africa
【2h】

Review of the environmental authorization followed during the construction of Eskom's Kusile and Medupi power stations, South Africa

机译:审查南非Eskom的Kusile和medupi发电站建设期间的环境许可

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Environmental impact assessment follow-up has been widely addressed by various researchers. However, there is still a gap in the actual implementation of this process. This study addresses this gap by evaluating the effectiveness of implementing the environmental authorizations of Eskom’s Kusile and Medupi Power Stations during the construction phase. The main aim of the study is to determine whether the environmental authorization conditions were effectively implemented by project developers and whether full compliance which could lead towards sustainable development was at the forefront of Kusile and Medupi developments. The survey method was used whereby questionnaires were formulated and completed by fifty (50) participants involved in the implementation of both power stations’ environmental authorizations. The results showed that the importance of protecting the environment and overall compliance with the projects’ environmental authorization conditions are well understood and implemented. However, some of the responses indicated the difficulty in implementing certain environmental authorization conditions such as retaining existing vegetation cover. About Nineteen (19) external audit reports (of which nine were for Kusile and ten for Medupi) between the periods of 2008 to 2014 were reviewed and the audit results shown good percentage of over 90% compliance with the environmental authorization at both power stations.In conclusion, the environmental authorizations were well implemented by both Kusile and Medupi Power Stations. The environmental management through compliance with the environmental authorization is at the forefront of the Eskom’s developments and thus promotes sustainable development. The outcome of this study has a wide application that includes application to any new project that involves building infrastructure.
机译:各种研究人员已广泛讨论了环境影响评估的后续行动。但是,在此过程的实际实施中仍然存在差距。这项研究通过评估在施工阶段实施Eskom的Kusile和Medupi电站的环境授权的有效性来解决这一差距。该研究的主要目的是确定项目开发商是否有效地执行了环境许可条件,以及是否可以完全实现可持续发展的合规性处于Kusile和Medupi开发的最前沿。使用调查方法,由参与实施两个电站的环境授权的五十(50)名参与者制定并填写了调查表。结果表明,保护环境和全面遵守项目环境授权条件的重要性已得到充分理解和实施。但是,一些答复表明难以执行某些环境授权条件,例如保留现有植被。审查了2008年至2014年之间大约十九(19)份外部审核报告(其中9份针对Kusile,10份针对Medupi),并且审计结果表明,两个电厂均符合90%以上的环境授权要求。总之,Kusile电站和Medupi电站都很好地执行了环境授权。通过遵守环境授权进行环境管理是Eskom发展的最前沿,从而促进了可持续发展。这项研究的结果得到了广泛的应用,其中包括对涉及建筑基础设施的任何新项目的应用。

著录项

  • 作者

    Molepo Emmy;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号