首页> 外文OA文献 >Addressing the project implementation challenges in the Saudi Arabian power supply industry : an investigative approach towards improving project delivery
【2h】

Addressing the project implementation challenges in the Saudi Arabian power supply industry : an investigative approach towards improving project delivery

机译:解决沙特阿拉伯电力供应行业的项目实施挑战:改进项目交付的调查方法

摘要

For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.
机译:几十年来,沙特阿拉伯王国以可靠的石油出口国而闻名。但是,这一事实并没有使其免于面临重大的国内能源挑战。这些挑战中最紧迫的挑战之一是弥合不断扩大的电力供需缺口,目前,电力需求的增长速度非常快。解决这一挑战的一种关键方法是通过以最高效率交付电源项目。然而,在这个高度资本密集的行业中,项目交付延迟并不罕见,这表明电力供应无法应对需求的增长。为了更深入地了解项目实施和有效实践的挑战,本研究采用务实的方法,对文献,问卷和半结构化访谈进行了三角剖分。该研究是在沙特阿拉伯的电力供应行业-西部作业区进行的。总共收集了105份可用的问卷,并进行了28次记录的,半结构化的访谈,分析和综合分析,以形成一个概念模型,该模型构成了所调查行业中项目实施的挑战。这是通过对所有58个已确定和调查的因素进行综合排名分析来实现的,据调查行业的项目从业人员称,这些因素导致了项目延误。这些项目延迟因素中有28个被选为“最重要”因素。因子分析被用来将这28个最重要的项目延迟因子构造为以下有意义的一组7个项目实施挑战:沙特电力公司的合同承诺,沙特电力公司的沟通和协调有效性,承包商的项目计划和项目控制有效性,与顾问相关的方面,人力挑战和重大不确定性,沙特电力公司的招标系统以及缺乏明确的项目要求。该研究对行业政策具有影响,因为它对关键项目利益相关者的中心问题提供了一致的评估。通过这种分析,提出了一些务实的建议,这些建议如果得到实施,将使所确定的问题对未来项目成果的重要性最小化,从而有助于确保电力供需差距减小。

著录项

  • 作者

    Alhoweish Bandar;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号