首页> 外文OA文献 >Upgrading hydropower plants with storage: timing and capacity choice
【2h】

Upgrading hydropower plants with storage: timing and capacity choice

机译:用存储升级水电站:时间和容量选择

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper presents an investment decision support framework for a hydropower producer with storage facilities that is considering upgrading the production capacity in its power plant. A real options framework is proposed to support the investment decision, where both investment timing and capacity choice are considered. Using a case from a Norwegian hydropower producer, we employ the framework to evaluate investment opportunities in this company. Our main contribution is an approach that combines hydropower scheduling and real options valuation for already constructed power plants. Furthermore, the results from our case analysis suggest feasible investment strategies for the hydropower producer.
机译:本文提出了一种具有存储设施的水电生产商的投资决策支持框架,该框架正在考虑提高其发电厂的生产能力。提出了一个实物期权框架来支持投资决策,同时考虑投资时机和产能选择。以挪威一家水电生产商的案例为例,我们使用该框架评估该公司的投资机会。我们的主要贡献是将水电调度与已建电厂的实物期权评估相结合的方法。此外,我们案例分析的结果表明了水电生产商可行的投资策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号