首页> 外文OA文献 >Methodology for optimal energy system design of Zero Energy Buildings using mixed-integer linear programming
【2h】

Methodology for optimal energy system design of Zero Energy Buildings using mixed-integer linear programming

机译:采用混合整数线性规划的零能耗建筑物最优能量系统设计方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

According to EU’s Energy Performance of Buildings Directive (EPBD), all new buildings shall be nearly Zero Energy Buildings (ZEB) from 2018/2020. How the ZEB requirement is defined has large implications for the choice of energy technology when considering both cost and environmental issues. This paper presents a methodology for determining ZEB buildings’ cost optimal energy system design seen from the building owner’s perspective. The added value of this work is the inclusion of peak load tariffs and feed-in-tariffs, the facilitation of load shifting by use of a thermal storage, along with the integrated optimisation of the investment and operation of the energy technologies. The model allows for detailed understanding of the hourly operation of the building, and how the ZEB interacts with the electricity grid through the characteristics of its net electric load profile. The modelling framework can be adapted to fit individual countries' ZEB definitions. The findings are important for policy makers as they identify how subsidies and EPBD’s regulations influence the preferred energy technology choice, which subsequently determines its grid interaction. A case study of a Norwegian school building shows that the heat technology is altered from HP to bio boiler when the ZEB requirement is applied.
机译:根据欧盟的《建筑物能源性能指令》(EPBD),从2018/2020年起,所有新建筑物均应接近零能耗建筑物(ZEB)。在考虑成本和环境问题时,如何定义ZEB要求对能源技术的选择具有重大影响。本文提供了一种从建筑物所有者的角度来看确定ZEB建筑物成本最佳能源系统设计的方法。这项工作的附加价值是包括峰值负荷电价和上网电价,通过使用蓄热器促进负荷转移以及对能源技术的投资和运营进行综合优化。该模型可以详细了解建筑物的每小时运行情况,以及ZEB如何通过其净电力负荷曲线的特征与电网进行交互。可以对建模框架进行调整以适合各个国家的ZEB定义。这些发现对于政策制定者很重要,因为他们确定补贴和EPBD的法规如何影响首选的能源技术选择,从而决定其与电网的相互作用。挪威某学校建筑的案例研究表明,当采用ZEB要求时,加热技术已从高压改为了生物锅炉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号