Nevada Risk Assessment/Management Program (NRAMP) – Phase 2: Quarterly Progress Report, Oct. 1, 2006- Dec. 31, 2006

机译:内华达州风险评估/管理计划(NRamp) - 第二阶段:季度进展报告,2006年10月1日至2006年12月31日

摘要

Work conducted in this initial period consisted of work start-up (technical, administrative, contractual), and interviewing/site visits with DOE NVO staff (and support contractors) and HRC staff to quickly ascertain current technical activities and priorities as related to the scope of this task.Since much of the technical work scope builds on previous technical work, it was considered critical to determine the changes (programmatic, technical, and regulatory) that have occurred over the past several years that directly relate to the scope. It was also equally important to determine the technical and programmatic priorities that have been established in the interim.
机译:在最初阶段进行的工作包括工作启动(技术,行政,合同)以及对DOE NVO员工(和支持承包商)和HRC员工的访谈/现场访问,以快速确定与范围相关的当前技术活动和优先级由于许多技术工作范围是基于先前的技术工作,因此确定过去几年中与范围直接相关的变更(计划,技术和法规)被认为是至关重要的。确定过渡时期确定的技术和方案重点也同样重要。

著录项

  • 作者

    Stetzenbach Klaus J.;

  • 作者单位
  • 年度 2007
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类
  • 入库时间 2022-08-20 21:05:37

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号