Causes and Impacts of Geotechnical Problems on Bridge and Road Construction Projects

机译:岩土工程问题对桥梁和筑路工程的影响

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

Changes during the construction phase generate cost growth, schedule delays, and claims in any project. However, the impact of geotechnical problems on construction costs, schedules, and claims in bridge and road projects had not been investigated in depth. The major objectives of this study were to determine the geotechnical-related causes of cost and schedule growth and claims as well as their impacts on the bridge and pavement projects’ performance. This study also identifies mitigation measures to avoid cost and schedule growth and claims in these projects.A survey was conducted with 53 engineers from state Department of Transportations (DOTs) and 43 engineers from design consultant firms. It was found that the geotechnical-related causes that most impacted the costs, schedules, and claims of bridge projects were lack of boring locations and misclassified subgrade. The majority of the respondents stated that these geotechnical-related causes had negative impacts on cost and schedule growth and the number of claims for bridge projects during construction. When asked about pavement projects, the respondents stated that the significant problems to impact the cost and schedule growth and claims were misclassified subgrade and a level of groundwater table higher than expected. The results regarding the impact of these geotechnical-related causes on project performance were similar to those of bridge projects. The survey results also showed three major preventive measures to reduce these cost overruns, schedule growth, change orders, and claims were: the designer having detailed knowledge about the project site’s geotechnical information, a detailed site investigation with a well-experienced consultant, and the development and implementation of minimum standards for subsurface investigation and site characterization.
机译:施工阶段的变更会导致成本增长,进度延迟和任何项目的索赔。但是,尚未深入研究岩土工程问题对桥梁和道路项目中的施工成本,进度表和索赔的影响。这项研究的主要目的是确定与岩土工程有关的成本,进度增长和索赔的原因,以及它们对桥梁和人行道工程性能的影响。这项研究还确定了缓解措施,以避免这些项目的成本和进度增长以及索赔。一项调查是对来自州交通部(DOT)的53名工程师和设计顾问公司的43名工程师进行的。结果发现,与岩土工程有关的原因对桥梁工程的成本,进度和索赔影响最大,原因是缺乏钻孔位置和路基分类错误。大多数受访者表示,这些与岩土工程有关的原因对成本和进度增长以及施工期间桥梁工程的索赔数量产生了负面影响。当被问及路面工程时,受访者表示,影响成本,进度和索赔的重大问题是路基分类错误,地下水位高于预期。这些与岩土工程相关的原因对项目绩效的影响结果与桥梁项目相似。调查结果还表明,减少这些成本超支,进度增长,变更单和索赔的三项主要预防措施是:设计人员对项目现场的岩土技术信息有详细的了解,与经验丰富的顾问进行的详细现场调查以及制定和实施地下调查和现场特征描述的最低标准。

著录项

  • 作者

    Neupane Krishna Prasad;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号