Evaluation of Alternative Project Delivery Methods in Water and Wastewater Projects

机译:水和污水项目中替代项目交付方法的评估

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The United States (U.S.) is facing significant challenges in addressing aging water infrastructure. Most of the drinking water infrastructure is reaching the end of their useful lives. The American Water Works Association (AWWA) estimated that it will cost about $1 trillion to repair or replace drinking water pipes. Over the next 20 years, it will cost about $298 billion to fix or expand pipes of the nationu27s wastewater and storm-water systems (AWWA, 2012). Owners, engineers, and contractors are using Alternative Project Delivery (APD) methods - e.g., Design-Build Construction Management-at-Risk Construction Management/General Contractor- to build water and wastewater projects in order to save time, cost, and improve the quality of the projects.The purpose of the research was to find the ownersu27 satisfaction levels regarding various benefits related to APD methods as well as different obstacles in using these methods in water and wastewater projects. In addition to this, it was to determine the different satisfaction level of APD methods experienced by different levels of respondents as well as by type of project delivery method experience. A survey questionnaire was prepared and emailed to 455 utility owners to determine their assessments about these project delivery methods.The results showed the majority of respondents were satisfied with various benefits provided by the APD methods. They also showed that Project Staff was significantly more satisfied with APD methods than Utility Manager. Design-Build users were significantly more satisfied with the quality of completed project than Construction Management-at-Risk users. In addition, Statistical analysis of the responses revealed important insight to interested parties of the water industry.
机译:美国(美国)在解决老化的水基础设施方面面临重大挑战。大部分饮用水基础设施即将达到使用寿命。美国自来水厂协会(AWWA)估计,维修或更换饮用水管道的费用约为1万亿美元。在未来20年内,修复或扩建美国废水和雨水系统管道的费用约为2980亿美元(AWWA,2012年)。业主,工程师和承包商正在使用“替代项目交付”(APD)方法-例如,“设计-建造-施工风险管理” /“总承包商”来建造水和废水项目,以节省时间,成本并改善施工过程。研究的目的是找到业主对与APD方法相关的各种收益以及在水和废水项目中使用这些方法的障碍的满意程度。除此之外,还要确定不同级别的受访者所经历的APD方法的不同满意度水平以及项目交付方法经验的类型。准备了一份调查问卷并将其通过电子邮件发送给455位公用事业所有者,以确定他们对这些项目交付方式的评估。结果表明,大多数受访者对APD方法提供的各种好处感到满意。他们还表明,项目人员对APD方法的满意度远高于Utility Manager。与风险管理人员相比,设计建造用户对已完成项目的质量更加满意。此外,对这些答复的统计分析揭示了对水行业感兴趣的各方的重要见识。

著录项

  • 作者

    Maharjan Ruiko;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号