An Evaluation of the Oregon Department of Transportation’s (ODOT) Environmental Streamlining Efforts: A Focus on CETAS

机译:对俄勒冈州交通局(ODOT)环境优化工作的评估:关注CETas

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Oregon Department of Transportation responded to the federal call in the late 1990s to streamline the National Environmental Policy Act (NEPA) by (1) implementing organizational and procedural changes internal to the agency, (2) funding ODOT-dedicated staff positions in state and federal resource agencies, and (3) convening regular meetings with state and federal agencies with NEPA-related regulatory responsibilities. This latter effort evolved into the CETAS (Collaborative Environmental and Transportation Agreement for Streamlining) process that includes a management and a technical team element. This document reports an assessment of the effectiveness of these efforts. Phase I of the study was designed to document the perceptions and behaviors in ODOT employees at the onset of ODOT organizational and procedural changes and to compare the responses to ones obtained from ODOT employees after some passage of time. The time period covered in this section is roughly Fall 2001 to Fall 2003. Phase II of the study was designed to assess the effectiveness of the CETAS process and documents factors that affect project timelines in Oregon state highway projects for pre-CETAS projects. The third section of this document includes an analysis of the CETAS process based on interviews conducted in the spring and summer of 2004.
机译:俄勒冈州交通部在1990年代后期响应联邦政府的呼吁,以简化国家环境政策法案(NEPA),方法是:(1)实施该机构内部的组织和程序变更;(2)为ODOT专职的州和州工作人员提供资金联邦资源机构,以及(3)与负责NEPA相关监管职责的州和联邦机构定期召开会议。后者的努力演变为CETAS(精简协作环境和运输协议)流程,其中包括管理层和技术团队元素。该文件报告了对这些努力有效性的评估。该研究的第一阶段旨在记录ODOT员工在ODOT组织和程序变化开始时的看法和行为,并比较一段时间后从ODOT员工那里获得的响应。本部分涵盖的时间大约是2001年秋季至2003年秋季。研究的第二阶段旨在评估CETAS流程的有效性,并记录影响CETAS之前项目的俄勒冈州立高速公路项目中影响项目时间表的因素。本文档的第三部分基于对CETAS流程的分析,该流程基于2004年春季和夏季进行的访谈。