The final project entitled “Racking Selection for the Cold Storage of PT. Bernofarm” began with the problem existing in company’s cold storage. The main problem of the cold storage is the lack of capacity which requires new racking and handling method to store all the goods on demand. The new layout with new system is targeted by the company to store 600 pallets. On the other hand, the company also needs a good low investment of money for the new proposed system. This final project begins with taking data required from the company such as company profile, building size and location, and the number of moving goods.ududSome racking alternatives are then compared and evaluated to fit the cold storage after getting the maximum number of goods stored in a day. Three best alternatives suitable for the company’s current needs are evaluated based on the layout and the calculation of cost needed to install each of the alternatives, furthermore one best racking suitable for the cold storage is chosen to maximize the capacity of the cold storage with a minimum cost to invest. The chosen racking is drive-in rack with capacity of 756 pallets. The investment of this racking is also the lowest from all other alternative with cost of US$10,135.45.
展开▼
机译:最终项目名为“ PT冷库的机架选择”。 Bernofarm”首先是公司冷藏库中存在的问题。冷库的主要问题是容量不足,这就需要新的货架和装卸方法来按需存储所有货物。该公司计划使用新系统的新布局来存储600个托盘。另一方面,该公司还需要为新的拟议系统提供较低的资金投入。这个最后的项目从获取公司所需的数据开始,例如公司简介,建筑物的大小和位置以及运送的货物的数量。 ud ud在获得最大数量之后,比较并评估了一些货架替代方案,以适应冷藏库的需求。一天存储的商品数量。根据布局和安装每种替代方案所需的成本计算,评估了三种适合公司当前需求的最佳替代方案,此外,还选择了一种适用于冷库的最佳货架,以最大程度地降低冷库的容量投资成本。选择的机架是可放入756个托盘的推入式机架。该货架的投资也是所有其他替代品中最低的,成本为10,135.45美元。
展开▼