首页> 外文OA文献 >THE ANALYSIS OF FOREMAN PERFORMANCE udON QUALITY MANAGEMENT IMPLEMENTATION udIN YOGYAKARTA CONSTRUCTION PROJECTud
【2h】

THE ANALYSIS OF FOREMAN PERFORMANCE udON QUALITY MANAGEMENT IMPLEMENTATION udIN YOGYAKARTA CONSTRUCTION PROJECTud

机译:对外表演的分析关于质量管理的实施在YOGYaKaRTa建设项目

摘要

This research will examine the process of achieving quality foreman representing contractors, and project quality management which consists of quality planning, quality control and quality assurance, which is used in the evaluation process. after reading this research, the reader gain insight into the process of achieving quality foreman and quality management of construction projectsudThis research was conducted using questionnaires and observation method, a data distribution measurements with descriptive analysis, to describe the level of ability of the foreman.udThis research reveals that the relationship between the foreman and the ability of education, experience, motivation and discipline in applying quality management in construction projects are very low and not significant. Therefore, the foreman are encouraged to receive training in education, as well as the discipline to implement and improve the performance of foremen and quality management in construction projects.ud
机译:这项研究将研究实现代表承包商的质量领班的过程,以及在评估过程中使用的由质量计划,质量控制和质量保证组成的项目质量管理。阅读本研究报告后,读者可以深入了解实现质量领班和建设项目质量管理的过程。 ud本研究采用问卷调查和观察方法,采用描述性分析进行数据分布测量,以描述领班的能力水平。 ud这项研究表明,工头与在建筑项目中应用质量管理的教育能力,经验,动机和纪律之间的关系非常低,而且不显着。因此,鼓励领班接受教育方面的培训,以及在建筑项目中实施和改善领班绩效和质量管理的学科。 ud

著录项

  • 作者

    Sari Dewa Ayu Apriana;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号