首页> 外文OA文献 >Identifying Traffic Problems in a Heavily Trafficked Urban Environment– Reference to SowerbyudBridge
【2h】

Identifying Traffic Problems in a Heavily Trafficked Urban Environment– Reference to SowerbyudBridge

机译:识别交通繁忙的城市环境中的交通问题 - 参考sowerby ud桥

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

1.1 BACKGROUNDudududThis study was commissioned by the Civic Trust to identify newudapproaches to traffic management solutions for Sowerby Bridge.udThe objective of the overall study was to identify low cost,udinnovative solutions to problems created by high volumes ofudtraffic using the A58. This road is the main shopping street inudSowerby Bridge. In our brief it was stressed that any new roadudconstruction such as a by-pass was not a feasible or acceptableudsolution due to the severe vertical gradients surrounding SowerbyudBridge.udududFurther, the town is on the brink of a major programme ofudregeneration. A nationally important canoe slalom has beenudcreated; the riverside mill area fronting onto the River Calderudis being developed for commercial and leisure use and there is audproposal to reopen the Rochdale Canal. In view of this it isudessential to ensure that traffic on the A58 is managed so as toudminimise its effect on the environment and trade, withoutudadversely affecting local access. In writing our report we haveudseparated the problem and solution identification stages. Theudsolution identification stage is reported in a companion reportud(Hopkinson et all 1988b). A further stage of our study whichudinvolves presenting our final solutions back to the users ofudSowerby Bridge for comment is to be reported in a forthcomingudreport, WP 265 (Hopkinson et al, 1988c).ududud1.2 INTRODUCTIONudududThis Working Paper describes the methods used and findings fromudthe first stage of our study carried out during October andudNovember 1987 to identify the problems experienced by the usersudof Sowerby Bridge. Here it is intended to draw conclusions aboutudthe approach adopted to elicit people's impressions aboutudproblems, the way in which this information was interpreted andudthe applicability of the method to other situations.ud
机译:1.1背景 ud ud ud这项研究是由Civic Trust委托进行的,旨在为Sowerby Bridge的交通管理解决方案确定新的 udapp方法。 ud总体研究的目的是确定低成本, u创新的解决方案,以解决由大批量产生的问题使用A58的交通拥堵。这条路是 udSowerby桥的主要购物街。在我们的简要介绍中,强调指出,由于Sowerby udBridge周围的严重垂直坡度,任何新的道路,道路建设(如旁路)都不可行或不可接受。 ud ud ud此外,该镇处于边缘 udregeneration的主要程序。已经创建了全国重要的独木舟激流回旋;沿卡德河(River Calder udis)前进的河滨磨坊区正在开发中,以供商业和休闲用途,并建议重新开放罗奇代尔运河(Rochdale Canal)。有鉴于此,有必要确保对A58上的流量进行管理,以使其对环境和贸易的影响最小化,而又不会对本地访问产生不利影响。在编写报告时,我们已将问题和解决方案的识别阶段分开。溶液的鉴定阶段在伴随报告 ud中进行了报道(Hopkinson等,1988b)。我们的研究的进一步阶段将向udSowerby Bridge用户提供最终解决方案,以征询他们的意见,这将在即将发表的ud报表WP 265中进行报告(Hopkinson等,1988c)。 2引言 ud ud ud本工作文件介绍了1987年10月至11月11日进行的第一阶段研究所使用的方法和发现,以确定用户Sowerby Bridge遇到的问题。这里旨在得出关于 ud问题所采用的方法的结论, ud问题的解释方式以及该方法在其他情况下的适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号