首页> 外文OA文献 >A multiphase optimal control method for multi-train control and scheduling on railway lines
【2h】

A multiphase optimal control method for multi-train control and scheduling on railway lines

机译:铁路多线列车控制调度的多相优化控制方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

We consider a combined train control and scheduling problem involving multiple trains in a railway line with a predetermined departure/arrival sequence of the trains at stations and meeting points along the line. The problem is formulated as a multiphase optimal control problem while incorporating complex train running conditions (including undulating track, variable speed restrictions, running resistances, speed-dependent maximum tractive/braking forces) and practical train operation constraints on departure/arrival/running/dwell times. Two case studies are conducted. The first case illustrates the control and scheduling problem of two trains in a small artificial network with three nodes, where one train follows and overtakes the other. The second case optimizes the control and timetable of a single train in a subway line. The case studies demonstrate that the proposed framework can provide an effective approach in solving the combined train scheduling and control problem for reducing energy consumption in railway operations.
机译:我们考虑一个组合的火车控制和调度问题,该问题涉及一条铁路线上的多列火车,并且这些火车在沿该站的车站和会合点具有预定的出发/到达序列。该问题被表述为多阶段最优控制问题,同时考虑了复杂的列车运行条件(包括起伏的轨道,变速限制,运行阻力,取决于速度的最大牵引力/制动力)以及列车实际运行对出发/到达/运行/停留的限制次。进行了两个案例研究。第一种情况说明了在具有三个节点的小型人工网络中,两列火车的控制和调度问题,其中一列火车追随另一列并超越另一列。第二种情况优化了地铁线路中单列火车的控制和时间表。案例研究表明,提出的框架可以为解决铁路调度与控制相结合的问题提供有效方法,以减少铁路运营中的能耗。

著录项

  • 作者

    Ye, H; Liu, R;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号