首页> 外文OA文献 >Evaluation of Alternative Guided Bus Designs: Results for Kingston Upon Hull.
【2h】

Evaluation of Alternative Guided Bus Designs: Results for Kingston Upon Hull.

机译:替代引导公交车设计的评估:金斯敦船体的结果。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper describes the background and methodology employed in research funded by the EPSRC to assess the traffic management implications of guided bus schemes. One central aim of the project is to demonstrate how simulation tools can be adapted to account for the special features of guided bus schemes and demonstrate their applicability on an actual planned scheme. Traditional bus priority measures are first assessed for their benefits and these are contrasted with those from the planned guided bus scheme. Variations to the planned scheme are also considered. udud A sophisticated microsimulation model is used to assess the impact of incorporating guided bus infrastructure into three planned schemes. Two of these are from Leeds and Kingston-upon-Hull and are largely within the existing Road infrastructure, whilst the third is from Chester and is largely segregated from the existing road infrastructure. ududThis paper deals exclusively with the Kingston-upon-Hull scheme. The network under consideration is due north of Hull city center and contains two main arterials, the Beverley Road and Stoneferry Road, together with a network of connecting roads. The traditional bus priority measures are concentrated on the Beverley Road, which is currently the main bus arterial of the two roads. When the guideways are constructed the intention is that the Stoneferry Road would become a more important bus arterial than it currently is. The planned guided bus scheme exists in four variants: two-way at the kerb; two-way in the median; tidal in the median and an elevated section located in the median. This paper describes the evaluation of the base network; the individual traditional priority measures; the combined traditional priority measures and the four planned guided bus schemes.
机译:本文介绍了由EPSRC资助的研究中使用的背景和方法,以评估有轨巴士计划对交通管理的影响。该项目的主要目的之一是演示如何将仿真工具用于考虑到有向导公交车方案的特殊功能,并展示其在实际计划方案中的适用性。首先评估传统公交优先措施的益处,并将其与计划的引导公交计划的优势进行对比。还考虑了计划方案的变化。 ud ud使用复杂的微仿真模型来评估将有向导公交车基础设施纳入三个计划方案的影响。其中两个来自利兹和赫尔河畔金斯顿,主要在现有道路基础设施之内,而第三个来自切斯特,主要与现有道路基础设施隔离。 ud ud本文仅涉及赫尔河畔金斯顿方案。正在考虑中的网络将在赫尔市中心以北,并包含两条主要干线,即贝弗利路和斯通费里路,以及连接道路的网络。传统的公交优先措施集中在贝弗利路(Beverley Road)上,这是目前两条路的主要公交干线。修建导轨后,其目的是使斯通弗里路比现在更重要。计划中的有轨电车计划有四个变体:路缘两路;中位双向;中间有潮汐,中间有升高的部分。本文描述了基础网络的评估;个别传统优先措施;结合了传统的优先措施和四个计划中的有轨电车计划。

著录项

  • 作者

    Clark S.D.;

  • 作者单位
  • 年度 1999
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号