首页> 外文OA文献 >An Investigation into the Potential Barriers Facing the Development of Offshore Wind Energy in Scotland:Case Study - Firth of Forth Offshore Wind Farm
【2h】

An Investigation into the Potential Barriers Facing the Development of Offshore Wind Energy in Scotland:Case Study - Firth of Forth Offshore Wind Farm

机译:苏格兰海上风能发展面临的潜在障碍调查:案例研究 - 海上风电场的峡湾

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Scottish Executive has set ambitious targets of achieving 100% of electricity from renewable sources by 2020. As Scotland has the best offshore wind resources in Europe, the development of this energy source is crucial for reaching these targets. However, the development of offshore wind raises a number of issues related to economic viability, grid connection and public acceptability. This paper investigates these areas in greater depth, using a case study of the Firth of Forth offshore wind farm, in order to determine if these barriers can be overcome in time to make a valuable contribution to 2020 targets. Through interviews with relevant stakeholders, it emerged that there are various obstacles which are impeding progress in offshore wind development in Scotland. It became evident that stakeholder opposition, an inadequate renewable energy support mechanism, and the insufficient grid infrastructure off the Scottish coast are posing barriers, and hindering development. It became apparent that in order to overcome these barriers, a number of changes need to take place. A more inclusive approach to stakeholder engagement is required, which facilitates the sharing of knowledge. In order to improve the economic viability of offshore wind in Scotland, adopting a new mechanism which reduces risk and provides developers and investors with more certainty, would be more effective in encouraging offshore wind development. Finally, in order to overcome the most significant barrier, the grid, a more integrated and collaborative approach is required, which will share the burden of responsibility between the developer, Ofgem, and the National Grid.
机译:苏格兰行政院制定了雄心勃勃的目标,即到2020年实现100%的可再生能源用电。由于苏格兰拥有欧洲最佳的海上风能资源,因此开发这种能源对于实现这些目标至关重要。但是,海上风电的发展提出了许多与经济可行性,并网和公众接受度有关的问题。本文以福斯峡湾海上风电场为例,对这些地区进行了更深入的研究,以确定是否可以及时克服这些障碍,从而为2020年目标做出宝贵贡献。通过与相关利益相关者的访谈,发现存在各种障碍,阻碍了苏格兰海上风电开发的进展。显然,利益相关者的反对,可再生能源支持机制不足以及苏格兰沿海的电网基础设施不足都构成障碍,并阻碍了发展。显然,为了克服这些障碍,需要进行许多改变。需要采取一种更具包容性的方法来促进利益相关者的参与,以促进知识共享。为了提高苏格兰海上风电的经济生存能力,采用一种降低风险并为开发商和投资者提供更多确定性的新机制,将在鼓励海上风电发展方面更加有效。最后,为了克服最大的障碍,网格需要一种更加集成和协作的方法,这将在开发人员,Ofgem和国家网格之间分担责任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号