首页> 外文OA文献 >Discount rates for long-term projects:The cost of capital and social discount rate compared
【2h】

Discount rates for long-term projects:The cost of capital and social discount rate compared

机译:长期项目的贴现率:资本成本和社会贴现率进行比较

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Research on the cost of capital and on the social discount rate (SDR) has developed largely along separate paths. This paper offers an overview and comparison of both concepts. The consumption-based theory of discount rates is common to both, but there are striking differences in how the cost of capital and SDR are estimated. A project’s cost of capital is inferred in practice from market data, by a well-established package of techniques, and project risk makes a large difference. In contrast, the SDR is estimated by applying judgement about the welfare of future generations, in the setting of consumption-based theory. Project risk has tended to be ignored under the SDR approach.
机译:关于资本成本和社会贴现率(SDR)的研究主要是沿着不同的途径进行的。本文提供了这两个概念的概述和比较。基于消费的折现率理论对于这两者都是通用的,但是在估算资本成本和特别提款权方面存在显着差异。实践中,通过一套完善的技术包,可以从市场数据中推断出项目的资金成本,而项目风险则有很大的不同。相反,在基于消费的理论背景下,通过对后代的福利作出判断来估算特别提款权。在SDR方法下,项目风险往往被忽略。

著录项

  • 作者

    Armitage, Seth;

  • 作者单位
  • 年度 2017
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号