首页> 外文OA文献 >Rainfall Deduction Method for Estimating Non-Point Source Pollution Load for Watershed
【2h】

Rainfall Deduction Method for Estimating Non-Point Source Pollution Load for Watershed

机译:降雨量推算法估算流域非点源污染负荷

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The water pollution can be divided into point source pollution (PSP) and non-point source pollution (NSP). Since the point source pollution has been controlled, the non-point source pollution is becoming the main pollution source. The prediction of NSP load is being increasingly important in water pollution controlling and planning in watershed. Considering the monitoring data shortage of NPS in China, a practical estimation method of non-point source pollution load --- rainfall deduction method is established based on the rainfall and water quality data which already existed in China. Compared with the runoff division method, the rainfall deduction method has a simple calculation and a reasonable result without additional NSP monitoring data.
机译:水污染可分为点源污染(PSP)和非点源污染(NSP)。由于点源污染得到控制,非点源污染正成为主要污染源。 NSP负荷的预测在流域水污染控制和规划中越来越重要。考虑到我国核动力源监测数据的不足,根据我国已有的降雨和水质数据,建立了一种实用的面源污染负荷估算方法-降雨减量法。与径流分割法相比,降雨减少法的计算简单,结果合理,无需额外的NSP监测数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号