首页> 外文OA文献 >Extra unit-speed machines are almost as powerful as speedy machines for flow time scheduling
【2h】

Extra unit-speed machines are almost as powerful as speedy machines for flow time scheduling

机译:额外的单位速度机器几乎与用于流动时间安排的快速机器一样强大

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

We study online scheduling of jobs to minimize the flow time and stretch on parallel machines. We consider algorithms that are given extra resources so as to compensate for the lack of future information. Recent results show that a modest increase in machine speed can provide very competitive performance; in particular, using O(1) times faster machines, the algorithm SRPT (shortest remaining processing time) is 1-competitive for both flow time [C. A. Phillips et al., in Proceedings of STOC, ACM, New York, 1997, pp. 140-149] and stretch [W. T. Chan et al., in Proceedings of MFCS, Springer-Verlag, Berlin, 2005, pp. 236-247] and HDF (highest density first) is O(1)-competitive for weighted flow time [L. Becchetti et al., in Proceedings of RANDOM-APPROX, Springer-Verlag, Berlin, 2001, pp. 36-47]. Using extra unit-speed machines instead of faster machines to achieve competitive performance is more challenging, as a faster machine can speed up a job but extra unit-speed machines cannot. This paper gives a nontrivial relationship between the extra-speed and extra-machine analyses. It shows that competitive results via faster machines can be transformed to similar results via extra machines, hence giving the first algorithms that, using O(1) times unit-speed machines, are 1-competitive for flow time and stretch and O(1)-competitive for weighted flow time. © 2008 Society for Industrial and Applied Mathematics.
机译:我们研究作业的在线调度,以最大程度地减少流程时间并在并行计算机上进行扩展。我们考虑给定算法额外的资源,以弥补未来信息的不足。最近的结果表明,机器速度的适度提高可以提供非常有竞争力的性能。特别是,使用O(1)倍的速度更快的机器,算法SRPT(最短剩余处理时间)对于两个流时间[C]都是1竞争的。 A. Phillips等人,《 STOC会议录》,ACM,纽约,1997年,第140-149页]和拉伸[W. T. Chan等人,在MFCS会议录中,Springer-Verlag,柏林,2005年,第236-247页],HDF(密度最高的优先)在加权流动时间上具有O(1)竞争性[L。 Becchetti等人,《 RANDOM-APPROX会议录》,Springer-Verlag,柏林,2001年,第36-47页]。使用额外的单位速度机器而不是更快的机器来实现竞争性能更具挑战性,因为更快的机器可以加快工作速度,但是额外的单位速度机器则不能。本文给出了额外速度分析和额外机器分析之间的非平凡关系。结果表明,通过更快的机器获得的竞争结果可以通过额外的机器转换为相似的结果,因此给出了第一种算法,即使用O(1)乘以单位速度的机器,其流动时间和拉伸和O(1)都具有1竞争性。 -有竞争力的加权流动时间。 ©2008工业和应用数学协会。

著录项

  • 作者

    Chan HL; Liu KS; Lam TW;

  • 作者单位
  • 年度 2007
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号