首页> 外文OA文献 >A bilevel programming approach to assembly job shop scheduling
【2h】

A bilevel programming approach to assembly job shop scheduling

机译:一种用于装配车间调度的双层编程方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A bilevel programming approach for assembly job shop scheduling isproposed. Two levels of decision makers are identified in the model. The firstlevel is the project manager and the second level is the shop floor manager. Thefirst level aims to minimize the earliness and tardiness ofcompleted jobs. Thesecond level aims to minimize the average shop floor throughput time. Becausetheir aims may conflict, these levels optimize their own objectives based on anon-cooperative game playing process. Their decision variables are denoted byorder release mechanisms and dispatching rules respectively. Using a simulationapproach, this paper identifies the best choice for the project manager underdifferent job shop utilization levels. The research findings can providemanagerial guidance to the project manager as which order release mechanisms touse in order to optimize his objective. © 2009 IEEE.
机译:提出了一种用于组装作业车间调度的双层编程方法。该模型确定了两个级别的决策者。第一层是项目经理,第二层是车间经理。第一级旨在最大程度地减少已完成工作的及时性和延误性。第二层旨在最小化平均车间吞吐时间。由于它们的目标可能会发生冲突,因此这些级别会基于非合作游戏过程来优化其目标。它们的决策变量分别由订单发布机制和调度规则表示。本文使用模拟方法,为不同工场利用率水平的项目经理确定了最佳选择。研究结果可以为项目经理提供管理指导,以使用哪种订单发布机制来优化其目标。 ©2009 IEEE。

著录项

  • 作者

    Huang GQ; Lu H;

  • 作者单位
  • 年度 2009
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号