Integrated scheduling, assembly area- and part-assignment for large scale, make-to-order assemblies

机译:集成式调度,装配区域和部件分配,适用于大规模,按订单生产的装配

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The problem of scheduling multiple, large scale, make-to-order assemblies is considered. Beside "classical" precedence- and resource constraints as known from resource constrained project scheduling we take spatial resource and part availability constraints into account. The objective is to minimize the sum of the weighted tardiness. We propose a MIP-model of the problem which is a generalization of three allocation problems. Since the problem is NP-hard, a list-scheduling heuristic is proposed and evaluated on a set of benchmark instances.
机译:考虑了安排多个大规模按订单生产的装配的问题。除了从资源受限的项目计划中已知的“经典”优先级和资源约束之外,我们还考虑了空间资源和零件可用性约束。目的是使加权迟到的总和最小化。我们提出了该问题的MIP模型,该模型是三个分配问题的概括。由于问题是NP难题,因此提出了列表调度启发式方法,并在一组基准实例上进行了评估。

著录项

  • 作者

    Kolisch Rainer;

  • 作者单位
  • 年度 1998
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng