We consider the resource-constrained project scheduling problem (RCPSP). The focus of the paper is on a formal definition of semi-active, active, and non-delay schedules. Traditionally these schedules establish basic concepts within the job shop scheduling literature. There they are usually defined in a rather informal way which does not create any substantial problems. Using these concepts in the more general RCPSP without giving a formal definition may cause serious problems. After providing a formal definition of semi-active, active, and non-delay schedules for the RCPSP we outline some of these problems occurring within the disjunctive arc concept.
机译:我们考虑了资源受限的项目调度问题(RCPSP)。本文的重点是对半主动,主动和无延迟时间表的正式定义。传统上,这些时间表在车间作业时间表文献中建立基本概念。在那里通常以相当非正式的方式定义它们,不会造成任何实质性的问题。在更一般的RCPSP中使用这些概念而未给出正式定义可能会导致严重的问题。在为RCPSP提供了半活动,活动和非延迟时间表的正式定义之后,我们概述了分离弧概念中发生的一些问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号