首页> 外文OA文献 >Minimal delaying alternatives and semi-active timetabling in resource-constrained project scheduling
【2h】

Minimal delaying alternatives and semi-active timetabling in resource-constrained project scheduling

机译:资源受限项目调度中的最小延迟替代和半主动时间表

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible a makespan minimal schedule among the resource and precedence feasible ones. The enumeration is oftenly reduced to the dominant set of semi-active schedules by checking feasibility of local left-shifts. In this paper we show that combining the concepts of minimal delaying alternatives and local left-shifts, if not properly done, does not, as claimed in the literature, reduce the enumeration to the set of semi-active schedules.
机译:多年来,已经开发了许多解决资源受限的项目计划问题的分支程序。列举延迟的替代方案,扩展替代方案,可行的姿态,可行的序列或可行的子集,它们的全部目的都是在资源和优先可行的方案中尽可能快地找到制造期最小调度。通过检查局部左移的可行性,通常会将枚举简化为半主动时间表的主要集合。在本文中,我们证明,如文献所述,将延迟最小的替代方案和局部左移的概念组合在一起(如果未正确完成的话)不会减少对半主动时间表的枚举。

著录项

  • 作者

    Sprecher Arno; Drexl Andreas;

  • 作者单位
  • 年度 1996
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号