首页> 外文OA文献 >Gas and Electricity Market Design for a Flexible Operation of Gas-fired Power Plants
【2h】

Gas and Electricity Market Design for a Flexible Operation of Gas-fired Power Plants

机译:燃气电厂灵活运行的燃气电力市场设计

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Gasu2010fired power plants constitute a direct and important link between the gas and the electricity sectors and thus between the Target Models for electricity and gas. As the need for a flexible operation of gas-fired power plants will increase in tomorrowu2019s lowu2010carbon power markets, so also will the challenges for market design of both sectors in allowing for flexible trading arrangements. For the electricity markets, options to advance intraday and balancing market design are currently discussed, such as complex bids, the frequency of intraday and balancing market clearing, and the joint optimization of energy and reserve markets. For the gas market, concrete options for design advances are yet to be explored. The success u2013 and the flaws u2013 of the implementation of the new EC Network Codes for gas will provide new food for debates. Last, the interaction between gas and electricity TSOs in balancing the heavily interlinked short-term electricity and gas markets poses a need for (more) coordination between the different types of TSOs.
机译:天然气发电厂构成了天然气与电力部门之间,因此也是电力与天然气目标模型之间的直接而重要的纽带。在明日的低碳市场中,对燃气电厂灵活运营的需求将会增加,因此在允许灵活交易安排方面,这两个行业的市场设计也将面临挑战。对于电力市场,目前正在讨论推进日内交易和平衡市场设计的选项,例如复杂的投标,日内交易和平衡市场清算的频率以及能源和储备市场的联合优化。对于天然气市场,尚待探索设计进步的具体选择。新的EC天然气网络法规实施的成功与弊端将为辩论提供新的动力。最后,天然气和电力TSO之间的相互作用以平衡高度相互联系的短期电力和天然气市场提出了在不同类型的TSO之间进行(更多)协调的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号