Scheduling resource-constrained projects with a flexible project structure

机译:使用灵活的项目结构调度资源受限的项目

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally implemented activities. However, established model formulations and solution approaches for the resource-constrained project scheduling problem (RCPSP) assume that the project structure is given in advance. In this paper, the traditional RCPSP is hence extended by a highly general model-endogenous decision on this flexible project structure. This is illustrated by the example of the aircraft turnaround process at airports. We present a genetic algorithm to solve this type of scheduling problem and evaluate it in an extensive numerical study.
机译:在具有灵活项目结构的项目中,事先未完全计划要安排的活动。相反,安排这样的项目包括决定是否完全执行特定活动。这也会影响最终执行的活动之间的优先级约束。但是,对于资源受限的项目计划问题(RCPSP),已建立的模型公式和解决方案方法假定项目结构是预先给出的。因此,本文通过对这种灵活的项目结构进行高度通用的模型内生决策来扩展传统的RCPSP。这是通过机场飞机转机过程的示例说明的。我们提出了一种遗传算法来解决这类调度问题,并在广泛的数值研究中对其进行了评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号