Evaluating main order contract forms for Major Industrial Plant Projects (MIPP) with respect to completion and performance of design risk allocation

机译:评估主要工业厂房项目(mIpp)的主要订单合同表格

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Contracts should be matched to the unique situation of a Major Industrial Plant Project (MIPP). However, in reality, oftentimes contract forms are chosen that do not fit participant's (owners', contractors') competences and risk capabilities. In this paper, MIPP order contract forms are evaluated for the most common settings of owners and contractors with respect to allocation of completion and performance-of-design risks. The research method takes a qualitative approach by using grounded theory and expert interviews. 39 interviews were conducted with a total of 48 interviewees - professionals from EPC and EPCM contractors, main technical component suppliers, consultants and representatives of owners. Firstly, it is defined what a MIPP is - considering technical as well as monetary terms. Secondly, using concepts of New Institutional Economics (NIE), the international context and the MIPP network of contracts are studied. Based on Project Finance literature, the commercial risks involved in a MIPP are laid-out. Focusing on the main order contract, the involved parties are termed, introducing a "standard situation" with typical core competences of owners and contractors. Finally, using results from the expert interviews, the core MIPP order contract forms - ownermanaged, EPC, EPCM, and deviations thereof are evaluated, illustrated by examples. Appropriate contractual risk allocation depends on the specific MIPP situation - to be understood by a thorough analysis of the owner's competences, capacities and experience in relation to the project.
机译:合同应与大型工业项目(MIPP)的独特情况相匹配。但是,实际上,通常会选择不符合参与者(所有者,承包商)能力和风险能力的合同形式。在本文中,针对完工和设计绩效风险的分配,针对所有者和承包商的最常见设置评估了MIPP订单合同表。研究方法采用扎根的理论和专家访谈的定性方法。与EPC和EPCM承包商的专业人士,主要技术组件供应商,顾问以及业主代表进行的总共48位受访者进行了39次访谈。首先,定义了MIPP是什么-考虑技术和货币条件。其次,使用新制度经济学(NIE)的概念,研究了国际背景和MIPP合同网络。根据项目财务文献,对MIPP中涉及的商业风险进行了规划。以主订单合同为重点,将涉及的各方称为“标准情况”,具有业主和承包商的典型核心能力。最后,通过专家访谈的结果,评估了MIPP核心订单合同表-所有者管理的,EPC,EPCM及其偏差,如示例所示。适当的合同风险分配取决于MIPP的具体情况-要通过对业主的能力,能力和与项目相关的经验进行全面分析来理解。

著录项

  • 作者

    Erbe Anita;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类