首页> 外文OA文献 >Volcanic Risk System (SRV): ASI Pilot Project to Support The Monitoring of Volcanic Risk In Italy by Means of EO Data
【2h】

Volcanic Risk System (SRV): ASI Pilot Project to Support The Monitoring of Volcanic Risk In Italy by Means of EO Data

机译:火山风险系统(sRV):通过EO数据支持意大利火山风险监测的asI试点项目

摘要

The ASI-SRV(Sistema Rischio Vulcanico) projectstarted at the beginning of the 2007 is funded by the ItalianSpace Agency (ASI) in the frame of the National Space Plan2003-2005 under the Earth Observations section for naturalrisks management. Coordinated by the Istituto Nazionale diGeofisica e Vulcanologia (INGV), which is responsible at nationallevel for the volcanic monitoring, the project has as mainobjective to develop a pre-operative system based on EO dataand ground measurements integration to support the volcanicrisk monitoring of the Italian Civil Protection Department. Theproject philosophy is to implement specific modules which allowto process, store and visualize through Web GIS tools EO derivedparameters considering three activity phases: 1) knowledge andprevention; 2) crisis; 3) post crisis. In order to combineeffectively the EO data and the ground networks measurementsthe system will implement a multi-parametric analysis tool,which represents and unique tool to analyze contemporaneouslya large data set of data in “near real time”. The SRV project willbe tested his operational capabilities on three Italian Volcanoes:Etna,Vesuvio and Campi Flegrei.
机译:2007年初开始的ASI-SRV(Sistema Rischio Vulcanico)项目由意大利航天局(ASI)在国家空间计划2003-2005的“地球观测”部分中的自然风险管理项目下进行资助。在国家一级负责火山监测的国家地质研究所(INGV)的协调下,该项目的主要目标是开发基于EO数据和地面测量数据集成的术前系统,以支持意大利民用火山的火山灰风险监测保护部。该项目的理念是实现特定的模块,这些模块允许通过Web GIS工具处理,存储和可视化EO派生参数,其中考虑了三个活动阶段:1)知识和预防; 2)危机; 3)危机过后。为了有效地结合EO数据和地面网络测量,系统将实现一个多参数分析工具,该工具代表了一种独特的工具,可以“近实时”地同时分析大量数据集。 SRV项目将在三座意大利火山上测试其运行能力:埃特纳火山,维苏威火山和坎皮弗莱格雷火山。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号