首页> 外文OA文献 >Research on information models for the construction schedule management based on the IFC standard
【2h】

Research on information models for the construction schedule management based on the IFC standard

机译:基于标准IFC的施工进度管理信息模型研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Purpose: The purpose of this article is to study the description and extension of the Industry\udFoundation Classes (IFC) standard in the construction schedule management, which achieves\udthe information exchange and sharing among the different information systems and\udstakeholders, and facilitates the collaborative construction in construction projects.\udDesign/methodology/approach: The schedule information processing and coordination are\uddifficult in complex construction projects. However, Building Information Modeling (BIM)\udprovides a platform for exchanging and sharing information among information systems and\udstakeholders based on the IFC standard.\udThrough analyzing the plan, implementing, check and control, the information flow in the\udschedule management is reflected based on the IDEF0. According to the IFC4, the information\udmodels for the schedule management are established, which not only includes the each aspect\udof the schedule management, but also includes the cost management, the resource\udmanagement, the quality management, the risk management and so on.\udFindings: The information requirement for the construction schedule management can be\udsummarized into three aspects: the schedule plan information, the implementing information\udand the check and control information, and three aspects can be described through the existing and extended entities of the IFC4, and different information models are established\udrespectively.\udOriginality/value: The main contribution of the article is to establish construction schedule\udmanagement information models, which achieve the information exchange and sharing in the\udconstruction project, and facilitate the development of the application software to meet\udrequirements of the construction project.
机译:目的:本文的目的是研究施工进度管理中行业\基础类别(IFC)标准的描述和扩展,以实现\不同信息系统和利益相关者之间的信息交换和共享,并促进\ udDesign / methodology / approach:在复杂的建设项目中,进度信息的处理和协调是\ ud很难的。但是,建筑信息模型(BIM)\提供了一个基于IFC标准在信息系统和利益相关者之间交换和共享信息的平台。\通过分析计划,实施,检查和控制,计划管理中的信息流是反映基于IDEF0。根据IFC4,建立了进度管理信息\ ud模型,不仅包括进度管理的各个方面\ ud,而且还包括成本管理,资源\管理,质量管理,风险管理等。 \ udFindings:施工进度管理的信息需求可以\概括为三个方面:进度计划信息,实施信息\ ud和检查和控制信息,并且可以通过现有和扩展的实体来描述三个方面。 \ ud原创性/价值:本文的主要贡献是建立施工进度表\管理信息模型,以实现\ udcon建设项目中的信息交换和共享,并促进开发。满足建设项目\要求的应用软件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号