首页> 外文OA文献 >Effects in service of the staggered construction of cable-stayed bridges built on temporary supports
【2h】

Effects in service of the staggered construction of cable-stayed bridges built on temporary supports

机译:临时支架斜拉桥交错施工的效果

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important role in the structural behaviour in service. Despite of this importance, these effects are rarely included into the definition of the structural response in service. In order to fill this gap, this paper deals with the effects in service of the staggered erection of steel cable-stayed bridges built on temporary supports. To do so, a criterion based on the minimization of the bending energy in terms of stay forces is applied to several cable-stayed bridges. This study shows the importance of the existence of the pylon-deck connection as well as the number and location of both construction joints and temporary supports during staggered erection.
机译:斜拉桥很少在一个施工阶段上建造,通常采用交错式施工。这种交错结构的效果不仅经济,因为它们还可能在服务中的结构行为中发挥重要作用。尽管具有这种重要性,但很少将这些影响包含在服务中结构响应的定义中。为了填补这一空白,本文探讨了在临时支座上架设钢斜拉桥交错架设的服务效果。为此,将基于拉力的弯曲能量最小化的准则应用于多个斜拉桥。这项研究表明,在交错安装过程中,存在吊塔-甲板连接的重要性以及施工缝和临时支撑的数量和位置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号