首页> 外文OA文献 >Longitudinal time-dependent response of segmental tunnel linings
【2h】

Longitudinal time-dependent response of segmental tunnel linings

机译:分段隧道衬砌的纵向时间响应响应

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The longitudinal forces introduced by tunnel boring machines (TBMs) to the segmental tunnel linings influence their structural response. The analyses of the linings construction process and the ground-structure interaction mechanisms have shown the influence of the lining creep on the progressive loss of the initial longitudinal force. An analytical formulation to predict the remaining compression of the linings as a function of time is proposed, supported by means of a complete numerical model, which considers the effect of creep during the sequential construction process. An experimental program to determine the creep of plastic packers was developed, revealing its significant influence on the global lining creep factor and the evolution of the remaining compressive stresses.
机译:隧道掘进机(TBM)向分段隧道衬砌引入的纵向力会影响其结构响应。对衬砌施工过程和地面-结构相互作用机制的分析表明,衬砌蠕变对初始纵向力的逐渐损失的影响。提出了一种分析公式来预测衬砌的剩余压缩强度随时间的变化,并借助一个完整的数值模型来支持,该模型考虑了在顺序施工过程中蠕变的影响。开发了确定塑料封隔器蠕变的实验程序,揭示了其对整体衬砌蠕变因子和剩余压应力演变的重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号