Design, transport, construction, and operation of the summer base Kohnen for ice-core drilling in Dronning Maud Land, Antarctica.

机译:设计,运输,建造和运营夏季基地Kohnen,用于南极洲Dronning maud Land的冰芯钻探。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

During the austral summer seasons 1999/2000 and 2000/2001 the summer base"Kohnen" was built as a platform for the EPICA deep ice core drilling in DronningMaud Land, Antarctica. The design is based on prefabricated container units. Thebase was erected within two summer seasons. Overland traverses with Pistenbullytractors and cargo sledges moved all needed material and base containers from theGerman base Neumayer at the Antarctic coast to the base Kohnen 750 km inland.All installations are completed at the end of the 2000/2001 season including thedrill and science trench with a cased 100-m borehole. Thus everything is preparedto start the deep drilling operation during the 2001/2002 austral summer season.
机译:在1999/2000和2000/2001的南方夏季,在南极DronningMaud Land建立了夏季基地“ Kohnen”,作为EPICA深冰岩心钻探的平台。该设计基于预制的集装箱单元。基地在两个夏季内竖起。陆上行驶的是皮斯滕布尔牵引车和货物滑车,将所有需要的物料和基础集装箱从南极海岸的德国诺伊迈尔基地转移到内陆750公里的科嫩基地。所有安装工作均在2000/2001季末完成,包括钻探和科学trench沟以及装在100米长的井眼中。因此,一切准备就绪,可以在2001/2002夏季南方开始深井作业。