首页> 外文OA文献 >Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time
【2h】

Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time

机译:多目标FJsp的元启发式,具有与序列相关的设置时间,辅助资源和机器停机时间

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper investigates the application of particle swarm optimization (PSO) to the multi-objective flexible job shop scheduling problem with sequence-dependent set-up times, auxiliary resources and machine down time. To achieve this goal, alternative particle representations and problem mapping mechanisms were implemented within the PSO paradigm. This resulted in the development of four PSO-based heuristics. Benchmarking on real customer data indicated that using the priority-based representation resulted in a significant performance improvement over the existing rule-based algorithms commonly used to solve this problem. Additional investigation into algorithm scalability led to the development ofa priority-based differential evolution algorithm. Apart from the academic significance ofthe paper, the benefit of an improved production schedule can be generalized to include costreduction, customer satisfaction, improved profitability, and overall competitive advantage.
机译:本文研究了粒子群优化(PSO)在具有序列依赖的建立时间,辅助资源和机器停机时间的多目标柔性作业车间调度问题中的应用。为了实现这个目标,在PSO范式中实现了替代粒子表示和问题映射机制。这导致了四种基于PSO的启发式方法的发展。对真实客户数据的基准测试表明,与通常用于解决此问题的现有基于规则的算法相比,使用基于优先级的表示可显着提高性能。对算法可伸缩性的额外研究导致了基于优先级的差分进化算法的发展。除了本文的学术意义外,改进的生产计划的好处可以概括为降低成本,提高客户满意度,提高利润率和总体竞争优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号