首页> 外文OA文献 >An exploratory assessment of project duration in multiple-project schedules where resources are allocated by the Theory of Constraints method
【2h】

An exploratory assessment of project duration in multiple-project schedules where resources are allocated by the Theory of Constraints method

机译:在多项目计划中对项目持续时间的探索性评估,其中资源由约束理论方法分配

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The theory of constraints (TOC) method for managing multiple projects provides arelatively new and simple heuristic for allocating constrained resources to projects.While this method is increasingly being used, there is little information about itsmerit and it has not yet been subjected to extensive testing. In this paper literaturerelevant to the allocation of resources to multiple projects is first reviewed.Thereafter the TOC method for allocating resources to multiple projects is explained.Finally the paper reports on an exploratory study to evaluate the effect that the TOCmethod for assigning resources has on project duration.
机译:用于管理多个项目的约束理论(TOC)方法为将约束资源分配给项目提供了相对新颖且简单的启发式方法。尽管这种方法越来越多地被使用,但是关于其优点的信息很少,并且尚未经过广泛的测试。本文首先回顾了与多个项目的资源分配相关的文献,然后解释了将资源分配给多个项目的TOC方法。最后,本文进行了探索性研究,以评估资源分配TOC方法对项目的影响持续时间。

著录项

  • 作者

    Dass, S.; Steyn, Herman;

  • 作者单位
  • 年度 2006
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号