Material Purchasing Management in Distribution Network Business

机译:配电网业务中的物资采购管理

摘要

In the last decade noticeable and long distribution outages around Finland have been caused by severe weather conditions. The outages have changed the public opinion and a more reliable electricity distribution is demanded. Lastly the Ministry of Employment and the Economy (TEM) has composed a new, more demanding law concerning of the electricity market, which came into the effect at 1.9.2013. The new law reduced allowed outage times caused by weather conditions to six hours in an urban area and to 36 hours in rural area. The new requirements have to be fulfilled at the latest in 2028 and during that time it is estimated that 3,5 billion euros have to be used for the network investments.This thesis work is done for Elenia Oyj, which has been in the past years one of the foregoing in the branch of business. It is said that Elenia has taken the contractor partnership network management to the new level in the branch of business. Elenia has also introduced a brand that is focused for underground cabling, called as “weather proof”, a framework that has begun as early as 2009.These heavily increased investment levels are a driver for the more sophisticated management methods for material purchasing. The objective of this thesis is to research and implement the key aspects of the modern material purchasing methods and practices based on the literature review and group studies. During the research process it came clear that special attention is needed for four different purchasing management areas: material portfolio analysis, supplier selection, supplier performance evaluation and demand forecasting. These aspects were selected because of the detected potential of efficiency improvement.In the thesis all these four different aspects are presented in own chapters. The main results of the thesis are the introduction of Kraljic portfolio matrix, AHP supplier selection method, supplier scorecard and an improved tool for the demand forecasting.
机译:在过去的十年中,恶劣的天气条件导致芬兰各地出现了明显且长期的配电中断。停电已经改变了公众舆论,需要更可靠的配电。最后,就业和经济部(TEM)制定了有关电力市场的要求更高的新法律,该法律于2013年1.9月生效。新法律将由于天气原因导致的允许停运时间减少到城市地区的六个小时和农村地区的36个小时。新的要求必须最迟在2028年得到满足,在此期间,估计必须花费35亿欧元用于网络投资。本文工作是针对Elenia Oyj进行的,这是过去几年的成果业务分支中的前述内容之一。据说Elenia在业务分支中将承包商合作伙伴网络管理提升到了新的水平。 Elenia还推出了专注于地下布线的品牌,称为“防风雨”,该框架早在2009年就已开始实施。这些大量增加的投资水平推动了更先进的材料采购管理方法。本文的目的是在文献综述和小组研究的基础上研究和实施现代物资采购方法和实践的关键方面。在研究过程中,很明显,需要特别注意四个不同的采购管理领域:物料组合分析,供应商选择,供应商绩效评估和需求预测。选择这些方面是因为已发现了提高效率的潜力。在本文中,所有这四个不同方面都在各自的章节中介绍。论文的主要成果是引入了Kraljic投资组合矩阵,层次分析法供应商选择方法,供应商记分卡和改进的需求预测工具。

著录项

  • 作者

    Kalliorinne Turkka;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号