Advanced application of transient stability constrained-optimal power flow to a transmission system including an HVDC-LCC link

机译:瞬态稳定性的高级应用约束最优功率流到包括HVDC-LCC链路的传输系统

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In this study, a transient stability constrained-optimal power flow (TSC-OPF) model is proposed and applied to a real case in the currently interconnected Balearic Islands-Iberian Peninsula system. The TSC-OPF retains the dynamics of all generators in the islands with fourth degree transient synchronous generator models and includes a representation of a high-voltage direct current (HVDC) link on the inverter side. The proposed large-scale non-linear optimisation problem, programmed in GAMS and solved using the CONOPT tool, is used to assess the economic impact of the HVDC on the Balearic Islands generation cost under different circumstances, using TSC-OPF and traditional OPF on the dispatch. Different recovery patterns of the HVDC link after a severe fault in the transmission grid are evaluated from the viewpoint of the cost and stability of power generation.
机译:在这项研究中,提出了暂态稳定约束最优潮流(TSC-OPF)模型,并将其应用于当前互连的巴利阿里群岛-伊比利亚半岛系统中的实际案例。 TSC-OPF使用四度瞬态同步发电机模型保留了孤岛中所有发电机的动态,并在逆变器侧包括了高压直流(HVDC)链路的表示。在GAMS中编程并使用CONOPT工具解决的拟议的大规模非线性优化问题,用于在不同情况下使用TSC-OPF和传统OPF评估高压直流输电对巴利阿里群岛发电成本的经济影响。调度。从成本和发电稳定性的角度,评估了输电网络中严重故障后的HVDC链路的不同恢复模式。