首页> 外文OA文献 >Factors affecting project management of jig and fixture manufacturer in South Johor, Malaysia
【2h】

Factors affecting project management of jig and fixture manufacturer in South Johor, Malaysia

机译:影响马来西亚柔佛州夹具及固定装置制造商项目管理的因素

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The economic growth in Malaysia has a number of benefits for downstream industries including jig and fixture manufacturers. The nature of jig and fixture manufacturer as small manufacturer enterprise (SME) with relatively less resource less focus on the importance of factors that affecting project management. Therefore, this research aims to identify the important factors that affect jig and fixture project management and to assess the degree of project management performance in a jig and fixture manufacturer, with the focus on South Johor region. In addition, the research also aims to obtain the correlation between factors affecting project management and project management performance, as well as to develop a prediction model for project management performance. In line with this, a quantitative approach was chosen with the population consisted of all jig and fixture manufacturers in South Johor, Malaysia. Simple random probability sampling was used to include 53 jig and fixture manufacturers. Data were collected through self administered questionnaires. Descriptive analysis, correlation analysis, and regression analysis was used. Findings from the study revealed that factor that perceived as important by respondents are human factor, followed by financial, organizational, technological supply chain relationship and physical factor. In term correlation, all factors were positively correlated with project management performance except human factor where regression model suggested that two strongest predictor are technological and supply chain relationship factor. Finding from the study suggested that factor that perceived as the most important is not correlated with project management performance, and the two strong predictors were perceived at medium important level. As such, further study could be conducted to study the implementation of those factors to identify the top of importance level, the effectiveness of the implementation, the focus level of the implementation and at once analyze the challenges and problem thus obtains the remedial strategies.
机译:马来西亚的经济增长为包括夹具和固定装置制造商在内的下游产业带来了许多好处。夹具和夹具制造商的性质是资源相对较少的小型制造企业(SME),因此较少关注影响项目管理的因素的重要性。因此,本研究旨在确定影响夹具和固定装置项目管理的重要因素,并评估夹具和固定装置制造商的项目管理绩效的程度,重点是柔佛州南部地区。此外,该研究还旨在获得影响项目管理和项目管理绩效的因素之间的相关性,并建立项目管理绩效的预测模型。因此,选择了一种定量方法,该方法由马来西亚南柔佛州所有夹具和固定装置制造商组成。简单的随机概率抽样用于包括53个夹具和固定装置制造商。通过自我管理的问卷收集数据。使用描述性分析,相关性分析和回归分析。研究发现,受访者认为重要的因素是人为因素,其次是财务,组织,技术供应链关系和物理因素。在长期相关性方面,除人为因素外,所有因素均与项目管理绩效呈正相关。在人为因素中,回归模型显示两个最强的预测指标是技术和供应链关系因素。从研究中发现,认为最重要的因素与项目管理绩效没有关系,并且两个重要的预测因素被认为处于中等重要水平。因此,可以进行进一步的研究来研究这些因素的执行情况,以识别重要性级别的顶部,实施的有效性,实施的重点级别,并立即分析挑战和问题,从而获得补救策略。

著录项

  • 作者

    Mohd. Hamel Nabila;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号