首页>
外文OA文献
>Load shedding scheme in large pulp mill by using analytic hierarchy process
【2h】
Load shedding scheme in large pulp mill by using analytic hierarchy process
展开▼
机译:运用层次分析法的大型制浆厂减载方案
展开▼
免费
页面导航
摘要
著录项
引文网络
相似文献
相关主题
摘要
Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. In particular, the breakdown of the generator would cause other generators to be overloaded. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. In order to determine the sequences of load shedding scheme, analytic hierarchy process (AHP) is introduced. Analytic Hierarchy Process is one of the multi-criteria decision making methods. By using this method, the priority of the load can be determined. This paper presents the theory of the alternative methods to choose the load priority in load shedding scheme for a large pulp mill.
展开▼