首页> 外文OA文献 >Load shedding scheme in large pulp mill by using analytic hierarchy process
【2h】

Load shedding scheme in large pulp mill by using analytic hierarchy process

机译:运用层次分析法的大型制浆厂减载方案

摘要

Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. In particular, the breakdown of the generator would cause other generators to be overloaded. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. In order to determine the sequences of load shedding scheme, analytic hierarchy process (AHP) is introduced. Analytic Hierarchy Process is one of the multi-criteria decision making methods. By using this method, the priority of the load can be determined. This paper presents the theory of the alternative methods to choose the load priority in load shedding scheme for a large pulp mill.
机译:制浆厂是重工业之一,其生产过程中消耗大量电力。特别地,发电机的故障将导致其他发电机过载。因此,减载方案是处理这种情况的最佳方法。为了保护发电机不受损坏,该方案将减少选定的负载。同时,子序列负载将被释放,直到发电机足以为其他负载提供功率为止。为了确定减载方案的顺序,引入了层次分析法。层次分析法是多准则决策方法之一。通过使用此方法,可以确定负载的优先级。本文介绍了在大型制浆厂减负荷方案中选择负荷优先级的替代方法的理论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号