首页> 外文OA文献 >Framework development of bills of quantities accuracy in construction organisation
【2h】

Framework development of bills of quantities accuracy in construction organisation

机译:施工组织中工程量清单准确性的框架开发

摘要

The Bill of Quantities (BQ) is a document that itemises information collected from the process of measurement and provides the descriptions, quantities and information of items required in a contract. These information are mainly used by contracting organisations in fulfilling their contractual duties. However, previous studies have revealed some concerns on the information contents of the BQ that have impacted its usability by contractors. Attempts to improve the BQ seem to concentrate on the BQ formats that do not parallel the improvements required for the BQ. This research aims to develop a conceptual framework that indicates important information requirements and significant issues as the basis to improve the uses of the BQ. The research outlines five objectives which include determining the uses of the BQ to the contracting organisations, determining the important BQ information requirements, determining significant issues impeding the uses of the BQ, developing and validating a conceptual framework as the basis to improve the uses of the BQ. Through survey, questionnaires were distributed to 500 active G7 contractors in Kuala Lumpur where 22.4% responded. Data was tested and analysed by means of Communality, Cronbach's Alpha, Relative Importance Index and the Analysis of Importance. The research determines 30 uses of the BQ, and shows that quantities is the most important information required in the overall uses of the BQ while inaccurate/wrong quantities, insufficient information on quantities, and inaccurate descriptions are the most significant issues impeding the uses of the BQ. The information requirements and issues that were considered important from the analyses are the main inputs to the framework. These are organised into two levels of importance, with inputs featured in the first level have higher weightage in improving the respective uses of the BQ as compared to the inputs featured in the second level of the framework. The framework asserts that improving the respective uses of the BQ can be planned in two stages based on the respective levels of importance. Validation for the framework was carried out through interviews with 10 personnel with at least 15 years of construction related experience. The results show an acceptable congruity where no changes are required, affirming the validity of the framework. The framework provides a usable basis in strategising improvements on the uses of the BQ to the contracting organisations.
机译:数量清单(BQ)是一份文件,该文件逐项列出了从测量过程中收集的信息,并提供了合同中所需项目的描述,数量和信息。这些信息主要由订约组织用来履行其合同职责。但是,先前的研究表明,对于BQ的信息内容存在一些担忧,这些问题影响了承包商的可用性。改进BQ的尝试似乎集中在与BQ所需的改进不相符的BQ格式上。这项研究旨在建立一个概念框架,该框架指出重要的信息需求和重大问题,以此作为改进BQ使用的基础。该研究概述了五个目标,其中包括确定承包商对BQ的使用,确定重要的BQ信息要求,确定阻碍BQ使用的重大问题,开发和验证概念框架作为改善BQ使用的基础。 BQ。通过调查,问卷被分发给了吉隆坡的500个G7活跃承包商,其中22.4%的受访者对此表示满意。通过社区,克朗巴赫(Cronbach's)Alpha,相对重要性指数和重要性分析对数据进行了测试和分析。该研究确定了BQ的30种用途,并表明数量是BQ整体使用中最重要的信息,而数量不正确/错误,数量信息不足以及描述不正确是阻碍使用BQ的最重要问题。 BQ。分析中认为重要的信息需求和问题是该框架的主要输入。这些内容分为两个重要级别,与框架第二个级别的投入相比,第一个级别的投入在改善BQ的各个用途方面的权重更高。该框架声称,可以根据各自的重要性水平在两个阶段中计划改进BQ的各个用途。通过与10位具有至少15年与建筑相关经验的人员进行访谈,对框架进行了验证。结果表明,在不需要进行任何更改的情况下,一致性是可以接受的,从而确认了框架的有效性。该框架为制定改进BQ给订约组织的使用提供了有用的基础。

著录项

  • 作者

    Bandi Shamsulhadi;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号