首页> 外文OA文献 >Petri Nets modeling of a real world manufacturing processes
【2h】

Petri Nets modeling of a real world manufacturing processes

机译:真实世界制造过程的Petri Nets建模

摘要

Every company strives to increase their profits. One of the key factors in ensuring the profits is effective utilization of manufacturing resources through application of efficient planning and scheduling approaches. These two main approaches are closely related to the manufacturing processes in a flexible manufacturing system (FMS) which are known as process planning and production scheduling. Process planning is refers to a process plan which is generated for each part to be manufactured in a manufacturing system (Wang and Li, 1991). The process plan specifies operations to be performed and their sequence, required resources and process parameters of each operation. On the other hand, production scheduling determines the most appropriate moment to execute each operation for the planned production, taking into account the due date, a maximum resource utilization, etc., in order to achieve high productivity in a manufacturing system (Kempenaers et al., 1996). One of the objectives of this work is to develop the process models, to help the definition of production processes. These models allow focusing on the second objective, which is to implement an integrated process planning, to specify the operations to be performed in manufacturing a product; and production scheduling, to estimate a start time for the particular operations to be performed in the case of manufacturing an automotive spring product. This chapter concentrates on the modeling of production processes using Petri Nets (PN) in order to understand the dynamic behavior of machine and production processes. Our case study is automotive spring production.
机译:每个公司都在努力增加利润。确保利润的关键因素之一是通过应用有效的计划和调度方法来有效地利用制造资源。这两种主要方法与柔性制造系统(FMS)中的制造过程紧密相关,这被称为过程计划和生产计划。工艺计划是指在制造系统中为要制造的每个零件生成的工艺计划(Wang和Li,1991)。过程计划指定要执行的操作及其顺序,每个操作所需的资源和过程参数。另一方面,为了在制造系统中实现高生产率,生产计划确定了最适当的时间来执行计划的生产的每个操作,同时考虑了到期日,最大的资源利用率等。 (1996年)。这项工作的目标之一是开发过程模型,以帮助定义生产过程。这些模型允许专注于第二个目标,即实施集成的流程计划,以指定要在制造产品时执行的操作;和生产调度,以估计在制造汽车弹簧产品时要执行的特定操作的开始时间。本章重点介绍使用Petri网(PN)对生产过程进行建模,以了解机器和生产过程的动态行为。我们的案例研究是汽车弹簧的生产。

著录项

  • 作者

    Zakaria Zalmiyah; Deris Safaai;

  • 作者单位
  • 年度 2008
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号