首页> 外文OA文献 >Analisis keberkesanan sistem penyelarasan kos projek pembangunan perisian menggunakan model reka bentuk Awalan Cocomo II
【2h】

Analisis keberkesanan sistem penyelarasan kos projek pembangunan perisian menggunakan model reka bentuk Awalan Cocomo II

机译:使用Cocomo II Prefix设计模型的软件开发项目成本调整系统的成本效益分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

Recently, there are many software tools that have been used to estimate software development project. Conventionally, most organization that involved in developing software development project used the software to ease the estimation problems. However, project manager has faced some difficulties in finding the convenient software for their needs because of the availability of many estimation software projects in the market and the cost are very expensive. In order to achieve local economic market in budgeting, this research has focused on the analysis of System Estimation of Software Development Project (SESDP) using early design model in Constructive Cost Model (COCOMO) 2.0. The software development prototype model has been used to develop the SESDP as it can be rapidly developed. At the end, each type of model, technique and method involved in the development software has been tested for estimating the measurement in latest software development project. From the analysis, the project manager has found that the tool has been easily used to estimate the early software cost development project.
机译:最近,有许多软件工具已用于估算软件开发项目。按照惯例,大多数参与开发软件开发项目的组织都使用该软件来缓解估算问题。但是,由于市场上有许多估算软件项目的可用性,因此项目经理在寻找满足其需求的便捷软件方面面临一些困难,并且成本非常昂贵。为了在预算中实现本地经济市场,本研究着重于使用建设性成本模型(COCOMO)2.0中的早期设计模型对软件开发项目(SESDP)的系统评估进行分析。软件开发原型模型已用于开发SESDP,因为它可以快速开发。最后,测试了开发软件中涉及的每种模型,技术和方法,以估计最新软件开发项目中的度量。通过分析,项目经理发现该工具很容易用于估算早期软件成本开发项目。

著录项

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号