首页> 外文OA文献 >Factors affecting the preparation of the construction work programme
【2h】

Factors affecting the preparation of the construction work programme

机译:影响施工计划编制的因素

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Work programme can be valuable management tool that allows the contractor to use resources efficiently and provides advance notice of situations that may cause the project to be delayed. It can also be an important tool for evaluation and proving delay claims. A previous study revealed that poor factual evidence and flaws in claim such as presenting a good and proper work programme are the principal facts leading to delays construction claims. Therefore, the objectives of this research are (1) To identify the factors that affecting the preparation of better construction work programme; and (2) To determine the approaches that can improve in preparing a better construction work programme. Comprehensive literature review has been conducted to gather the information on the factors affecting the preparation of construction work schedule followed by conducting structured interview session with the project personnel who has been working in the industry for 20 years and more as a main tool to gain data to establish the affecting factors. The data attained were analyzed these factors were divided into four (4) main categories which were project specific factors, project management, working condition and external environment related factors. Hence, all respondent are in their opinion that complexity, size, type, nature of the construction project, identifying the critical activities, good relationship, good coordination, good leadership as well as scope of nature of the work are the affecting factors in preparing the construction work programme. In conclusion, the study also identified recommendations that can be used by the project participants in order to prepare effective and good construction work schedule in the local construction industry.
机译:工作程序可以是有价值的管理工具,它可使承包商有效地使用资源,并提前通知可能导致项目延迟的情况。它也是评估和证明延误索赔的重要工具。先前的一项研究表明,事实证据不足和索赔方面的缺陷(例如提出良好而适当的工作计划)是导致延误施工索赔的主要事实。因此,本研究的目的是(1)找出影响准备更好的建筑工作方案的因素; (2)确定在准备更好的建筑工作方案时可以改进的方法。已经进行了全面的文献审查,以收集有关影响施工进度表编制的因素的信息,然后与从事该行业20年以上的项目人员进行结构化访谈,这是获取数据的主要工具。确定影响因素。将获得的数据进行分析,将这些因素分为四(4)个主要类别,分别是项目特定因素,项目管理,工作条件和外部环境相关因素。因此,所有受访者认为,建设项目的复杂性,规模,类型,性质,确定关键活动,良好的关系,良好的协调性,良好的领导能力以及工作的性质是影响准备工作的因素。建设工作方案。总之,该研究还确定了项目参与者可以使用的建议,以准备当地建筑行业有效且良好的施工进度表。

著录项

  • 作者

    Mohamad Mardiana;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类