首页> 外文OA文献 >Determination of felxible measures in advanced manufacturing system and their effect in productivity and responsiveness
【2h】

Determination of felxible measures in advanced manufacturing system and their effect in productivity and responsiveness

机译:确定先进制造系统中的灵活措施及其对生产率和响应能力的影响

摘要

Managing job shop manufacturing is quite different compared to other manufacturing systems due to its dynamic changes in process routings, cycle times and fluctuations in demand. Managers in job shops face problems in attaining optimum performance of the job shops. These can lead to failure to meet due dates, low machine level utilization and high level of work-in-progress (WIP). These problems can be exacerbated when management has to consider reacting to increase demand, which requires adding additional capacity. Increasing capacity may involve multiple alternatives for which little practical guidelines currently exist. This research investigates, by using simulation approach, the implication of adopting five possible alternatives of increasing job shop capacity and flexibility in terms of their system performance subjected to varying levels of incoming orders and order priorities. The measures of system performance are i) minimization of tardy jobs, ii) level of WIP and iii) machine utilization. A case study of a mold and die machine shop was used as the basis of the research. It was found that the most optimum alternative in increasing capacity is by selectively introducing machines to duplicate existing ones as opposed to replacing existing ones by a single flexible machine capable of performing operations previously done by several machines. The result of the study also serves as a practical guideline to the managers wishing to add capacity in similar circumstances. This however must be taken within the limitations and constraints of the case study.
机译:与其他制造系统相比,管理车间生产与其他制造系统完全不同,这是因为它动态地改变了工艺路线,周期时间和需求波动。作业车间的经理在实现作业车间的最佳性能方面面临问题。这些可能会导致无法按时交货,机器级别利用率低和正在进行中的工作(WIP)级别高。当管理层必须考虑对增加的需求做出反应时,这些问题可能会加剧,这需要增加容量。容量增加可能涉及多种替代方案,而对于这些替代方案,目前几乎没有实用的指导原则。这项研究通过使用仿真方法,研究了采用五种可能的选择来提高车间能力和灵活性的隐含性,这些方案在输入订单和订单优先级变化的情况下,提高了系统性能。系统性能的度量标准是:i)最小化迟滞的工作; ii)在制品的水平; iii)机器利用率。以一个模具加工车间的案例研究为基础。发现增加容量的最佳选择是通过选择性地引入机器来复制现有机器,而不是用能够执行先前由多台机器执行的操作的单个柔性机器来代替现有机器。研究结果也为希望在类似情况下增加能力的管理人员提供了实用指南。但是,这必须在案例研究的限制和约束内进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号