首页> 外文OA文献 >Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
【2h】

Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry

机译:在建筑行业中实施综合项目交付(IPD)和建筑信息模型(BIM)

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

To increase productivity, the global construction industry has adopted several different project delivery methods and IT tools over the last 10 years. Although there have been previous efforts to define and Implement new generation methods such as Integrated Project Delivery (IPD) and Building Information Modeling (BIM) in the construction industry, but these concepts are still considered new-comers especially in most of developing countries. These countries widely use the traditional methods namely Design-Bid-Build (DBB) and Computer Aided Design (CAD) instead of using them. This study is to analyze Building Information Modeling (BIM) applications potential in the process of Integrated Project Delivery (IPD) and compare it with the Implementation process of conventional tool (CAD) into the Design –bid-build delivery method. For this reason, a case which is a three story residential apartment building located on Tehran is selected. The process of implementation of existing CAD drawings of this case into DBB will be analyzed. Then, the case will be modeled and simulated within BIM applications and its exploiting potential will be identified within IPD. It is expected that the shifting framework path from CAD-DBB into BIM-IPD based on the lessons learned from case study and conducted interviews are developed to clarify these concepts capabilities.
机译:为了提高生产率,过去十年来,全球建筑业采用了几种不同的项目交付方法和IT工具。尽管以前在建筑业中已经努力定义和实施新一代方法,例如集成项目交付(IPD)和建筑信息模型(BIM),但是这些概念仍然被认为是新兴的,尤其是在大多数发展中国家。这些国家广泛使用传统方法,即设计投标构建(DBB)和计算机辅助设计(CAD),而不是使用它们。本研究旨在分析在集成项目交付(IPD)过程中建筑信息模型(BIM)应用的潜力,并将其与常规工具(CAD)的实现过程进行比较,以设计-投标-建造交付方法。因此,选择了一个位于德黑兰的三层住宅公寓楼。将分析这种情况下现有的CAD图到DBB的实现过程。然后,将在BIM应用程序中对案例进行建模和仿真,并在IPD中确定其开发潜力。可以根据从案例研究和进行的访谈中学到的经验来开发从CAD-DBB到BIM-IPD的转换框架路径,以阐明这些概念的功能。

著录项

  • 作者

    Kaini Iman;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号