Enhanced demand side management method in optimizing utilization of available power supply

机译:增强需求侧管理方法以优化可用电源的利用率

摘要

Optimization of available power supply has become one of solutions to maintain continuity of electric power supply. In order to apply the solution, two essential issues to be considered are peak load and unused power. Peak load is condition when power usage exceeds peak load boundary. This condition causes power generator to operate at its limit and distress the power system. Unused power is excess of power from power generation that cannot be stored. Thus, it decreases efficiency of the power system. Demand Side Management (DSM) is a group of techniques in load management that focuses to tackle the issues. Direct Load Control (DLC) is one of the techniques in DSM method that handles peak load. This technique switches off some feeders in near real-time based on priority. In addition, this technique also applies scheduling mechanism to handle power payback phenomenon inherented in peak load. However, DLC technique does not consider unused power issue. Thus, this study combines DLC technique with proposed Dynamic Power Allocation (DPA) technique to consider the unused power issue. Combination of these two techniques is proposed as enhancement of DSM method to optimize utilization of available power supply. Simulation of power usage has been designed and experiment has been conducted. Two experiments were conducted: experiment that applies DLC technique only and experiment that applies combination of DLC and DPA techniques. To evaluate the performance of enhanced DSM method, load factor parameter is used. Load factor represents average power usage divided by maximum power usage at certain time period. Evaluation result shows that DLC technique only achieves 0.85 in terms of load factor. Moreover, load factor from enhanced DSM method is increased to 0.92. From the results, it can be concluded that the enhanced DSM method has achieved better optimization in utilizing the available power supply.
机译:优化可用电源已成为维持电源连续性的解决方案之一。为了应用该解决方案,需要考虑两个基本问题:峰值负载和未使用的功率。峰值负载是功率使用超出峰值负载边界时的条件。这种情况会导致发电机在其极限下运行,并使电力系统陷入困境。未使用的电力是指无法存储的多余电力。因此,它降低了电力系统的效率。需求方管理(DSM)是负载管理中的一组技术,重点解决这些问题。直接负载控制(DLC)是DSM方法中处理峰值负载的技术之一。此技术基于优先级几乎实时地关闭了某些馈线。另外,该技术还应用调度机制来处理峰值负载中固有的功率回收现象。但是,DLC技术不会考虑未使用的电源问题。因此,本研究将DLC技术与建议的动态功率分配(DPA)技术相结合,以考虑未使用的功率问题。提议将这两种技术结合起来作为DSM方法的增强,以优化可用电源的利用率。设计了功耗模拟并进行了实验。进行了两个实验:仅应用DLC技术的实验和结合DLC和DPA技术的实验。为了评估增强DSM方法的性能,使用了负载因子参数。负载系数表示平均用电量除以特定时间段的最大用电量。评估结果表明,DLC技术的负载系数仅为0.85。此外,增强型DSM方法的负载系数增加到0.92。从结果可以得出结论,增强型DSM方法在利用可用电源方面已实现了更好的优化。

著录项

  • 作者

    Shafer Muhammad Gary;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号